- Nome do projeto:
- Mustla Bridge
- Localização:
- Estonia
- Período de construção:
- 2019
- Engenheiro/desenhador:
- Geoman Ltd.
- Descrição do projeto:
- Reinforced Earth retaining structure using Redi-Rock PC System (Positive Connection)
Length of the whole structure: 44,5m
Height (including base block): 4,6 m
The Redi-Rock PC is a reinforced earth retaining wall solution based on the standard Redi-Rock segmental mass-gravity system. A 300mm wide strip of geogrid is pulled through the core of the block and is laid with a layer level with the base of the block and one at the top. Any tension is balanced by that in the other layer, preventing the grid from being pulled through the block. This creates a strong, consistent facing connection that does not vary in capacity with depth. - Software:
-
GEO 5 - Muro Redi-Rock
- Arquivos:
-
redi-rock-wall-estonia-bridge-abutment.pdf
Redi-Rock Wall - Mustla Bridge Abutment Design, Estonia
Project Gallery Leaflet - Mustla Bridge Estonia
Metro Line C, Prague, Czech Republic
- Nome do projeto:
- Construction of Metro Line C
- Localização:
- Prague - Ladvi - Letnany, Czech republic
- Período de construção:
- 2002–2007
- Engenheiro/desenhador:
- METROPROJEKT Praha, a. s.,
Ing. Jaroslav Kopecny - Software:
-
GEO 5 - Projeto de Contenções
GEO 5 - Verificação de Contenções
Galeria de Projetos - Metrô de Praga, Linha C
Concrete sewer, Slatina, Romania
- Nome do projeto:
- Concrete sewer - Slatina
- Localização:
- Slatina, jud. Olt, Romania
- Período de construção:
- 2014
- Engenheiro/desenhador:
- Proexrom, Romania
- Software:
-
GEO 5 - Solo Grampeado
Project Gallery Leaflet - Concrete Sewer
Nádraží Veleslavín Station, Prague, Czech Republic
- Nome do projeto:
- Nádraží Veleslavín Station, Metro V.A, Prague
- Localização:
- Prague, Czech Republic
- Período de construção:
- 2011 - 2014
- Engenheiro/desenhador:
- Metroprojekt Praha a.s.
Ing. Martina Urbánková - Descrição do projeto:
- Three-aisled station
Length: 100m
Maximum width: 22.34 m
Maximum height: 10.25 m
Side of the excavation area 70.6 m2
Secondary excavation area 42.9 m2 - Software:
-
GEO 5 - MEF
Galeria de Projetos - Estação de metrô Nádraží Veleslavín
Drilled piles, Brasilia, Brazil
- Nome do projeto:
- Drilled piles
- Localização:
- Brasilia, Brazil
- Período de construção:
- 2003–2005
- Engenheiro/desenhador:
- Renato P. Cunha, MSc, PhD
- Software:
-
GEO 5 - Projeto de Contenções
GEO 5 - Verificação de Contenções
Tunnel at the Intersection of King Abdulaziz Road with Abu Baker Road, Saudi Arabia
- Nome do projeto:
- Tunnel at the Intersection of King Abdulaziz Road with Abu Baker Road
- Localização:
- Saudi Arabia
- Período de construção:
- 2017-2018
- Engenheiro/desenhador:
- Civil Engr. Al-Hussain Hassan
- Descrição do projeto:
- Tunnel Length:650 M
Depth of excavation: 15.0m
Number of rows of anchors: 5
Distance between anchors: 3.0m
Contractor: Jeddah Foundation Company - Software:
-
GEO 5 - Verificação de Contenções
Bridge “Las Ferias Av”, Venezuela
- Nome do projeto:
- Bridge “Las Ferias Av”
- Localização:
- Valencia City, Venezuela
- Período de construção:
- 2015
- Engenheiro/desenhador:
- Sismica C.A. Ing. Edinson Guanchez (Msc, Esp)
- Descrição do projeto:
- Total Deck Length = 139 m (4 spans)
Maximum span length = 36 m
Access Ramps Length = 250 m
Total Bridge Length = 389 m - Software:
-
GEO 5 - Estabilidade de Taludes
GEO 5 - Muro de Solo Reforçado
GEO 5 - Encontro de Pontes
GEO 5 - Estaca
GEO 5 - Grupo de Estacas
- Arquivos:
-
additional-description-and-drawings.pdf
Deep Excavation in Prishtina, Kosovo
- Nome do projeto:
- Deep Excavation - Anchored Diaphragm Wall
- Localização:
- Prishtina, Kosovo
- Período de construção:
- 2018
- Engenheiro/desenhador:
- "Geotest Engineering", Prishtinë
Dr. Ing. Qani V. Kadiri
Ing. Adrian Kadiri - Descrição do projeto:
- Depth of excavation: 19.5m
Thickness of diaphragm wall: 0.6m
Number of rows of anchors: 5
Distance between anchors: 2.5m
- Software:
-
GEO 5 - Estabilidade de Taludes
GEO 5 - Verificação de Contenções
- Arquivos:
-
deep-excavation-in-prishtina.pdf
12-meter high Gabion Wall, Mexico
- Nome do projeto:
- 12-meter high Gabion Wall
- Localização:
- Guanajuato, Gto. México
- Período de construção:
- 2015
- Engenheiro/desenhador:
- Ing. Pedro J. Villarreal Pinzón
TREE CONTACTO S.A. DE C.V. - Software:
-
GEO 5 - Muro de Gabião
- Arquivos:
-
PDF - GEO5 - Gabion report
Athienou Sewage Treatment Plant and associated works, Cyprus
- Nome do projeto:
- Athienou Sewage Treatment Plant and associated works
- Localização:
- Cyprus
- Período de construção:
- 2015 - 2017
- Engenheiro/desenhador:
- Ioannis Pericleous, MSc, CEng, MIStructE
- Descrição do projeto:
- The project was a Design, Build, Operate contract and it included a sewage treatment plant with RC water tanks, one water retaining earth lagoon with capacity 100.000m3 and one 3.000m3. Project also included the design of several other associated works, such roads, 4no. Pumping stations located in Athienou community approx. 8m deep each, building irrigation network, etc.
- Software:
-
GEO 5 - Estabilidade de Taludes
GEO 5 - Recalque
-
Line 4 Metro, Budapest, Hungary
- Nome do projeto:
- Budapest Metro Line 4
- Localização:
- Keleti Railway Station - Budapest, Hungary
- Período de construção:
- 2007
- Engenheiro/desenhador:
- Goda Balázs, Honti Imre, Huszka Gábor Főmterv Zrt.
- Software:
-
GEO 5 - Verificação de Contenções
Office buildings, Madrid, Spain
- Nome do projeto:
- Construction office buildings “Quinta de los Molinos”
- Localização:
- Madrid, España
- Período de construção:
- 2004-2005
- Engenheiro/desenhador:
- Daniel Danés Grases
- Software:
-
GEO 5 - MEF
GEO 5 - Solo Grampeado
Gabion revetments, Ostrowo, Poland
- Nome do projeto:
- Gabion revetments – Jastrzębia Góra – Ostrowo
- Localização:
- Jastrzębia Góra – Ostrowo, Poland
- Período de construção:
- 2012
- Engenheiro/desenhador:
- INGEO Sp. z o.o.
Dr. Ing. Marcin Blockus - Software:
-
GEO 5 - Muro de Gabião
- Arquivos:
-
geo5-report-ostrowo.pdf
High-rise building, Istanbul, Turkey
- Nome do projeto:
- High-rise building
- Localização:
- Istanbul, Turkey
- Período de construção:
- 2007
- Engenheiro/desenhador:
- NYS Project Consultancy and Constracting Co.
Ing. Yavuz Seymen - Software:
-
GEO 5 - Projeto de Contenções
GEO 5 - Verificação de Contenções
High-rise building Soyak, Istanbul, Turkey
- Nome do projeto:
- High-rise building Soyak
- Localização:
- Istanbul, Turkey
- Período de construção:
- 2011-2012
- Engenheiro/desenhador:
- NYS Constructıon
- Descrição do projeto:
- Excavation depth: 32,5m
Piles installed: 10,700m
Anchors installed: 71,000m
Soil excavation: 205.000 m3 - Software:
-
GEO 5 - Verificação de Contenções
Kanianka dam, Slovakia
- Nome do projeto:
- Kanianka dam
- Localização:
- Town of Kanianka, Slovakia
- Período de construção:
- 2004
- Engenheiro/desenhador:
- Overall verification: Ing. Andrej Kasana
- Software:
-
GEO 5 - Estabilidade de Taludes
GEO 5 - MEF
New Connection, Prague, Czech Republic
- Nome do projeto:
- New Connection Prague
- Localização:
- Prague Main Station - Masaryk’s Station – Liben - Vysocany, Czech republic
- Período de construção:
- 2004–2010
- Engenheiro/desenhador:
- Ing.Miroslav Sedivy
- Software:
-
GEO 5 - MEF
Pedestrian tunnel, Gdansk, Poland
- Nome do projeto:
- Pedestrian tunnel – Gdansk
- Localização:
- Gdańsk, Poland
- Período de construção:
- 2013
- Engenheiro/desenhador:
- INGEO Sp. z o.o.
Dr. Ing. Marcin Blockus - Software:
-
GEO 5 - MEF – Túnel
Q22 Excavation Pit, Warsaw, Poland
- Nome do projeto:
- Q22 Excavation Pit, Warsaw, Poland
- Localização:
- Warsaw, Poland
- Período de construção:
- 2013 - 2016
- Engenheiro/desenhador:
- Buro Happold Polska Sp. z o.o.
Maciej Sobotkowski, MSc. Eng.
Zbigniew Czajewski, MSc. Eng. - Descrição do projeto:
- 155 meters high office building with 5 underground levels. The depth of the excavation pit is more than 20 meters.
- Software:
-
GEO 5 - Verificação de Contenções
Retaining walls RediRock, Newport, USA
- Nome do projeto:
- Sanville memorial public works facility
- Localização:
- Newport, USA
- Período de construção:
- 2008
- Engenheiro/desenhador:
- Souhegan Valley Engineering Inc.
New Hampshire, Newport USA - Software:
-
-
Shopping Center and Housing Project, Antalya, Turkey
- Nome do projeto:
- Shopping Center
- Localização:
- Antalya, Turkey
- Período de construção:
- 2009-2010
- Engenheiro/desenhador:
- NYS Constructıon
- Descrição do projeto:
- Excavation depth: 24m
Bored Piles installed: 18,000m
Anchors installed: 108,000m - Software:
-
GEO 5 - Verificação de Contenções
Temporary containment of terrain, Tenerife Norte, Spain
- Nome do projeto:
- Temporary containment of terrain
- Localização:
- Valle Colino, Tenerife Norte, Spain
- Período de construção:
- 2006
- Engenheiro/desenhador:
- Francisco Javier Cruz García
- Software:
-
GEO 5 - Solo Grampeado
Tesare dam, Tesare, Slovakia
- Nome do projeto:
- Tesare dam
- Localização:
- Town of Tesare, Slovakia
- Período de construção:
- 2004
- Engenheiro/desenhador:
- Overall verification: Ing. Andrej Kasana
- Software:
-
GEO 5 - Estabilidade de Taludes
GEO 5 - MEF
Tunnel ventilation access, Lérida, Spain
- Nome do projeto:
- Tunnel ventilation in AVE and Lérida access
- Localização:
- Avenue Once de Septiembre, Lérida, España
- Período de construção:
- 2008
- Engenheiro/desenhador:
- Ignacio Zuloaga
- Software:
-
GEO 5 - MEF
VMO Dobrovského, Prague, Czech Republic
- Nome do projeto:
- VMO Dobrovského Brno
- Localização:
- Road I/42 Brno, Czech republic
- Período de construção:
- 2002–2005
- Engenheiro/desenhador:
- Ing. Jaroslav Lacina
- Software:
-
GEO 5 - MEF
Waterworks Hosterwitz, Dresden, Germany
- Nome do projeto:
- Waterworks Hosterwitz
- Localização:
- Dresden - Hosterwitz, Germany
- Período de construção:
- 2012
- Engenheiro/desenhador:
- G.E.O.S. Ingenieurgesellschaft mbH
Dipl. – Ing. Juraj Ortuta, Dipl. – Ing. Andreas Köhler - Descrição do projeto:
- Safety assessment of complex of buildings for planned increase of flood control waterworks Hosterwitz.
- Software:
-
GEO 5 - MEF
Newry, Ireland - Dominican Chapel, Ireland
- Nome do projeto:
- Newry, Ireland - Dominican Chapel
- Localização:
- Newry, Northern Ireland
- Período de construção:
- 2017
- Engenheiro/desenhador:
- Geoman Ltd.
Liam K.D. - Descrição do projeto:
- Landscaping by MacWall system with NFC Fill.
Wall height: from 1.8 m to 3.6 m
Total number of walls: 5
- Software:
-
GEO 5 - Estabilidade de Taludes
GEO 5 - Muro de Solo Reforçado
- Arquivos:
-
PDF - Additional information about the project (detailed description, photos, documentation)
El Cerrillo Park Comenar Viejo, Spain
- Nome do projeto:
- El Cerrillo Park Comenar Viejo
- Localização:
- Madrid, Spain
- Período de construção:
- 2019
- Engenheiro/desenhador:
- Wall Designer: Geoman Ltd.
Redi-Rock Supplier: Memorial Parks - Descrição do projeto:
- Reinforced retaining wall using Redi-Rock PC System (Positive Connection)
Length of the whole structure: 70,2m
Max. height: 5,02 m
GEO5 Prefab Wall was used to assess the suitability of sheets of Geotextile reinforcement with a friction connection between blocks when the walls surpassed achievable heights using mass gravity, the Redi-Rock Wall module was used for standard Gravity analysis while the Stability Module provided global analysis for all sections considered.
The wall was founded on competent medium-dense granite sand and designed using the Spanish adaption of EC7 (UNE-EN 1997-1:2004) and associated annex.
The local soil group is described as Leptosols. The soil unit was described as Lithic and Dystric. - Software:
-
GEO 5 - Estabilidade de Taludes
GEO 5 - Muro Pré-Fabricado
Brantham, Suffolk - Two reinforced walls, UK
- Nome do projeto:
- Brantham, Suffolk - Two reinforced walls
- Localização:
- Brantham, Suffolk, UK
- Período de construção:
- 2021
- Engenheiro/desenhador:
- Kenneth Knox, Stabilisure Ltd.
- Descrição do projeto:
- Two 5.3m high, 70m long Rootlok hybrid nailed MSE walls at Stour view.
Number of rows of soil nails: 7
Nails distance: approx. 80cm
Total length of the supporting structure: 70m - Software:
-
GEO 5 - Estabilidade de Taludes
GEO 5 - Muro de Solo Reforçado
- Arquivos:
-
PDF - Additional information about the project (detailed description, photos, documentation)
Allenton, Derby - Ecocrib retaining wall, UK
- Nome do projeto:
- Allenton, Derby - Ecocrib retaining wall
- Localização:
- Allenton, Derby, UK
- Período de construção:
- 2020
- Engenheiro/desenhador:
- William Morrow (Geoman Ltd.)
Installer/ material supplier: PC Construction - Descrição do projeto:
- Ecocrib retaining wall - 100% recycled mixed polymer retaining crib wall system.
Maximum retained height: 4.1m
Total length: 50m - Software:
-
GEO 5 - Estabilidade de Taludes
GEO 5 - Muro Pré-Fabricado
- Arquivos:
-
PDF - Additional information about the project (detailed description, photos, documentation)
Lawley Village Phase 10, Telford, UK
- Nome do projeto:
- Lawley Village Phase 10, Telford
- Localização:
- Lawley Village, Telford
- Período de construção:
- 2021
- Engenheiro/desenhador:
- Kenneth Knox
Geoman Ltd. - Descrição do projeto:
- Height of reinforced slope: up to 6m
Total length of the slope: 300m
Slope stabilization technology: soil bag facing - Software:
-
GEO 5 - Estabilidade de Taludes
GEO 5 - Muro de Solo Reforçado
- Arquivos:
-
PDF - Additional information about the project (detailed description, photos, documentation)
Building of World Trade Center Asuncion
- Nome do projeto:
- Building of World Trade Center Asuncion
- Localização:
- Asunción - Paraguay
- Período de construção:
- 2012
- Engenheiro/desenhador:
- Ing. Augusto J. Leoni
- Descrição do projeto:
- Pile curtain with not pre-tensioned (passive) anchors.
Depth of excavation: 16 m
Diameter of piles: 0.23 m
Piles spacing: 0.90 m
Number of rows of anchors: 5
Distance between anchors: 2.50 m - Software:
-
GEO 5 - Estabilidade de Taludes
GEO 5 - Verificação de Contenções
Expansion of shopping center Shopping del Sol
- Nome do projeto:
- Expansion of shopping center Shopping del Sol
- Localização:
- Asunción - Paraguay
- Período de construção:
- 2014
- Engenheiro/desenhador:
- Ing. Augusto J. Leoni
- Descrição do projeto:
- Pile curtain with pre-tensioned (active) anchors.
Deep of excavation: from 14 to 18 m
Diameter of piles: 0,23 m
Piles spacing: 0,90 m
Number of rows of anchors: 4
Distance between anchors: Variable - Software:
-
GEO 5 - Estabilidade de Taludes
GEO 5 - Verificação de Contenções
Apartment house Eminent
- Nome do projeto:
- Apartment house Eminent - Asunción
- Localização:
- Asunción - Paraguay
- Período de construção:
- 2015
- Engenheiro/desenhador:
- Ing. Augusto J. Leoni
- Descrição do projeto:
- Pile curtain with pre-tensioned (active) anchors.
Deep of excavation: from 14 m
Diameter of piles: 0.23 m
Piles spacing: 0.90 m
Number of rows of anchors: 5
Distance between anchors: Variable - Software:
-
GEO 5 - Estabilidade de Taludes
GEO 5 - Verificação de Contenções
Paseo del Bajo parking in front of the Casa Rosada
- Nome do projeto:
- Paseo del Bajo parking in front of the Casa Rosada
- Localização:
- Argentina - Buenos Aires
- Período de construção:
- 2019
- Descrição do projeto:
- The construction pit is in close proximity to the historic sewerage system, which is more than 100 years old. The front of the excavation at a distance of only 6m from the sewer.
Depth of excavation: 10,5 m
Number of rows of anchors: 4
Distance between anchors: 2.50 m - Software:
-
GEO 5 - MEF
GEO 5 - Verificação de Contenções
Design of a Rock Slope
- Nome do projeto:
- Design of a Rock Slope
- Localização:
- Guizhou Province, China
- Período de construção:
- 2016 - 2017
- Engenheiro/desenhador:
- Guizhou Metallurgical Design and Research Institute
- Descrição do projeto:
- Rock slope stabilization using anchored reinforced concrete beams with two rows anti-slide piles at the lower edge of the slope.
- Software:
-
GEO 5 - Estabilidade de Taludes
GEO 5 - MEF
GEO 5 - Estaca Anti-deslizante
- Arquivos:
-
Output protocol from the GEO5 Slope Stability program
Slope stabilization using three rows of Anti-slide piles
- Nome do projeto:
- Slope stabilization using three rows of Anti-slide piles
- Localização:
- Jiangsu Province, China
- Período de construção:
- 2016
- Engenheiro/desenhador:
- Geological Engineering Investigation of Jiangsu Province
- Descrição do projeto:
- Slope stabilization with three rows of Anti-slide piles. Three separate series of stabilization piles: Pile diameter: 1m, 1m, 1.5m Pile depth: 9m, 11m, 15m Stabilization pile wall width: 19m, 27m, 33m Length of the stabilized part of the slope: approx. 120m
- Software:
-
GEO 5 - Estabilidade de Taludes
GEO 5 - Estaca Anti-deslizante
- Arquivos:
-
Output protocol from the GEO5 Slope Stability program
Shanghe Hanghu East Station - Retaining Wall
- Nome do projeto:
- Shanghe Hanghu East Station - Retaining Wall
- Localização:
- Zhejiang Province, China
- Período de construção:
- 2014 - 2016
- Engenheiro/desenhador:
- China Railway Siyuan Survey and Design Group Co., Ltd.
- Descrição do projeto:
- Slope supporting structures at the railway corridor. Retaining reinforced concrete wall based on piles and reinforced MSE wall. Depth of foundation piles: 18.5 m Height of the reinforced retaining wall: 4.6 m Height of MSE wall: 4.6 m Number of rows of geo-reinforcements: 4 Reinforcement length: 4m
- Software:
-
GEO 5 - Muro de Solo Reforçado
GEO 5 - Muro de Flexão
GEO 5 - Estaca
- Arquivos:
-
Output protocol from the GEO5 Cantilever wall and MSE wall program
Niuzhaishan Tunnel
- Nome do projeto:
- Niuzhaishan Tunnel
- Localização:
- Fujian Province, China
- Período de construção:
- 2012 - 2014
- Engenheiro/desenhador:
- Geological Engineering Investigation of Fujian Province
- Descrição do projeto:
- The Niuzhaishan Tunnel in total length 1,697 m.
The double arc-tube highway tunnel will span four lanes in each direction.
Excavation tube width: 32 m.
Excavation tube height: 22,5 m. - Software:
-
GEO 5 - MEF
GEO 5 - MEF – Túnel
GEO 5 - Estratigrafia
- Arquivos:
-
China Niuzhaishan Tunnel Output Report
Construction of Expressway S7, Poland
- Nome do projeto:
- Construction of Expressway S7, Koszwały-Nowy Dwór Gdański
- Localização:
- Poland
- Período de construção:
- 2018
- Engenheiro/desenhador:
- INGEO Sp. z o.o.
Dr. Ing. Marcin Blockus - Descrição do projeto:
- Stabilization of the expressway subsoil using a group of piles.
Pile diameter: 0,40m
Number of drilled displament piles: 186000
- Software:
-
GEO 5 - MEF
- Arquivos:
-
poland-subsoil-stabilization-expressway.pdf