Programa:
Idioma:

Verification

Verification of pile (or group of piles) bearing capacity depends on the verification methodology selected in the "Pile CPT" tab:

In settlement calculation it is possible to use either a load-settlement curve or a load-displacement curve when adopting the NEN 6743 standard.

Teste o software GEO5.
Gratuitamente.